Final Design Stage (Phase 3c) of this 1055m long steel box girder bridge across the Waal River. The cable stayed bridge carries the A50 motorway with a back and main span equal to 105 m and 270 m, respectively, and tower height of approximately 77m and 51m over deck level. The remaining bridge length corresponds to two (2) approach viaducts a four (4) span viaduct on the southern end and three (3) span viaduct on the northern end with a total distance of 345m and 230m, respectively. Fatigue assessment and strengthening strategy included the study of high strength concrete overlay under a cost-incentive cost-plus contract.