As part of its asset management strategy, the client carries-out every 2-year an independent review of the assets held in portfolio, in order to have a clear view of the O&M strategy in place and on asset condition.
I was responsible for the design review of the main four (4) bridges over the Circuito Mexiquence Exterior sector, as part of the scope of works:
a) Entronque Peñon Texcoco Bridge;
b) Dren General del Valle I; Bridge
c) Dren General del Valle II Bridge, and;
d) PSF México-Cuautla Bridge.
Bridges were suffering from settlements, as expected in the region, in some instances higher than the average regional settlements and in other instances excessive relative differential settlement between adjacent structures were observed. The Design Review also included the Operation and Maintenance (O&M) requirements a per the project agreement.