Lead Bridge and Civil Structure Senior Engineer responsible for the Technical Reviewer of viaduct and bridge structures over the BR-163 (consession section). The technical work included:
a) Long-term performance;
b) Finance strategy;
c) Cost estimate;
d) Construction program review, and;
e) Construction method of all widening scheme of existing highways bridges and new bridges.
This work was completed for a total of 69 bridges.