The terminal consists of a Gravity Base Structure (GBS, 180m long x 88m wide and a
height of 50m), which will be installed on the seabed in shallow water. The GBS comprises a rectangular concrete structure housing two large LNG tanks and supporting the equipment necessary to vaporize the liquid so that it can be piped to shore.
Technical consultancy services was provided, in addition to assistance on regulatory technical framework in Spain and production of several tender design documents.