Should you have any query, please do not hesitate to get in touch with me by clicking on the "Contact" icon.
I look forward to hearing from you.
Should you have any query, please do not hesitate to get in touch with me by clicking on the "Contact" icon.
I look forward to hearing from you.


As part of a framework agreement for structural expert services, the primary objective of the commissioning is to evaluate the structural integrity and safety of the bridges (Structural Capacity Review) and address any associated residual risks.
The bridge spans range from 18.3 m to 99.0 m. Notably, six (6) out of the nine (9) Steel bridge abutments were rehabilitated rather than newly constructed, while all bridges utilize Bailey’s pre-
engineered modular deck superstructure solution.
The second objective is to assess whether modifications in construction led to material changes in quantities.
Lastly, the third objective is to evaluate the proper
implementation of structural durability requirements during construction, with a primary focus on the bridge abutments.
