Should you have any query, please do not hesitate to get in touch with me by clicking on the "Contact" icon.
I look forward to hearing from you.
Should you have any query, please do not hesitate to get in touch with me by clicking on the "Contact" icon.
I look forward to hearing from you.
Technical Review and Design and Construction Independent Engineer services associated with the $1.54 billion Design-Build contract for the demolition and subsequent reconstruction of the elevated A20/A15 interchange in the heart of Montreal. More than 15 Bridges and 35 Retaining Walls have been reviewed over the different stages of the design development, including site supervision. A technical review also took place for Bridge EF-0 (Cable Stayed Bridge) over the Lachine Canal built on an unconventional form.
Demolition Experience: Lead Technical Reviewer for Existing Structure´s Modification (over ten (10) structures to be partially modified for temporary traffic management – structural modification/strengthening to existing structures works). Demolition strategy, sequence and equipment.