Should you have any query, please do not hesitate to get in touch with me by clicking on the "Contact" icon.
I look forward to hearing from you.
Should you have any query, please do not hesitate to get in touch with me by clicking on the "Contact" icon.
I look forward to hearing from you.
Construction engineering for the longest cable-stayed bridge in Vietnam, and the second crossing over the Mekong River, near Ho Chi Minh City.
Responsible for the stay sag effect analysis, buffeting anchorage design, and pier tie-down false-work design. The main cable-stayed structure over the river is composed of a 350 meter central span and side spans of 150 meters.