Should you have any query, please do not hesitate to get in touch with me by clicking on the "Contact" icon.
I look forward to hearing from you.
Should you have any query, please do not hesitate to get in touch with me by clicking on the "Contact" icon.
I look forward to hearing from you.
The objective of the present project was to perform the
necessary desk study to justify the suitability of the
Prefabricated UHPFRC/BSI® solution as a strengthening solution for steel deck fatigue problems typically encountered in The Netherlands.

Technical Suitability of the use of UHPFRC/BSI® Prefabricated Slab Panels for Ewijk Bridge (The Netherlands)
Fatigue pathologies, such as longitudinal through-deck plate cracks, and other critical preliminary failure mechanisn, were described in the developped report.
A comparison with the in-situ High Strength Concrete (HSC) alternative has also been performed.
A fatigue assessment in four (4) pre-define locations (control points) of the steel deck structure has led to acceptable damage level for an extended life time of thirty (30) years.
Project Details
Bridge and Civil Structure Senior Engineer
