Projects / Bridges

Seohae Grand Bridge

Ah-San, South Korea

Seohae Grand BridgeJoonghyuck Cho
Seohae Grand Bridge, photo 2Rayhouse
Seohae Grand Bridge, photo 3Gallivance
Seohae Grand Bridge, photo 4
Seohae Grand Bridge, photo 5
Client
Seohae Grand Bridge Construction Division Korea Highway Corporation, South Korea
Location
Ah-San, South Korea
Dates
1998 - 1999
Construction cost
$110 million
Key services
  • Deputy Lead Bridge Design Review Engineer
Typology
  • Cable-Stayed Bridge (CSB)
  • Composite structure and Concrete substructure
  • Span CSB: 260m + 470m + 260m

As part of the development of the Ah-San Bay, the Seohae Grand Bridge begins in Taek City Kyung Ki Do and ends in Jin County, Choong Chung Nam Do. It is a notable bridge in South Korea and is a critical component of the expressway, which connects the Seoul metropolitan area to the southwestern regions of South Korea. Seohae Grand Bridge is 990-meter-long cable stayed with a main span of 470 meters.

The bridge is 32 meters wide and will carry six lanes of traffic. The towers are 182 meters high with a parallel strand cable system (144 cables spaced at 12 meters). Lead Design Engineer responsible for the seismic response spectrum analysis, pylon legs and deck transverse analysis, and stability analysis of the bridge. Responsible also for the design check of the composite deck and reinforced concrete pylon structures.

PreviousMy Thuan BridgeNextSafer Schools Road Map (Morocco)