Ewijk Bridge

Ewijk, The Netherlands

Ewijk Bridge
Ewijk Bridge, photo 2
Ewijk Bridge, photo 3
Ewijk Bridge, photo 4
Client
Rijkswaterstaat, Dutch Ministry of Infrastructure and the Environment
Location
Ewijk, The Netherlands
Dates
2010 - 2011
Construction cost
Confidential
Key services
  • Technical Manager
  • Bridge and Civil Structure Senior Engineer
Typology
  • Cable-Stayed Bridge (CSB)
  • Steel (orthotropic section) and Concrete deck
  • Span CSB: 105m + 270m

Technical Manager for the Final Design Stage (Phase 3c) of this 1055m long steel box girder bridge across the Waal River, near Ewijk, and this bridge is also called Tacitus Bridge. The cable stayed bridge carries the A50 motorway with a back and main span equal to 105 m and 270 m, respectively, and tower height of approximately 77m and 51m over deck level. The remaining bridge length corresponds to two (2) approach viaducts a four (4) span viaduct on the southern end and three (3) span viaduct on the northern end with a total distance of 345m and 230m, respectively.

Fatigue assessment and strengthening strategy included the study of high strength concrete overlay under a cost-incentive cost-plus contract.