Projects / Advisory

Bridge Rapid Visual Assessment (RVA) Tool

Digital tool

Bridge Rapid Visual Assessment (RVA) Tool
Bridge Rapid Visual Assessment (RVA) Tool, photo 2
Bridge Rapid Visual Assessment (RVA) Tool, photo 3
Bridge Rapid Visual Assessment (RVA) Tool, photo 4
Bridge Rapid Visual Assessment (RVA) Tool, photo 5
Client
Internal Development
Location
Digital tool
Dates
2019
Construction cost
Not applicable
Key services
  • Bridge Technical Leader
  • Due Diligence (DD)
Typology
  • Reinforced Concrete (RC) Bridges
  • Post-tensioned Reinforced Concrete (PT) Bridges
  • Steel Built-up Girders (SBG) Bridge
  • Span Bridge: any

This aim of this application is:To provide a Rapid Visual Assessment (RVA) of bridge structures under International Standards to bridge owners (RVA = say max. 1 hour per bridge). To provide a Damage Cost Estimate for each analysed bridge structure. To provide recommendations on Maintenance priorities and Operation and Management strategies;This application is based on International Standard for Bridge Inspection works => Bridge Condition Indicators Editions 2002 and 2007.

PreviousAutomation Design of Reinforced Concrete BridgesNextBridge Standards Review