Projects / Infrastructures
Adriatic LNG Terminal (ALT)
Spain

Eurogruas
Dragados Offshore
Dragados Offshore
- Client
- Aker Kvaener, Norway; Exxon; Mobile, USA
- Location
- Spain
- Dates
- 2004 - 2008
- Construction cost
- $1.5 Billion
- Key services
- Bridge and Civil Structures Senior Engineer
- Project Manager
- Typology
- Gravity Base Structure (GBS) Tank
Project manager responsible for providing consultancy, assistance on regulatory issues in Spain and production of several tender design documents. These works covered:Geotechnical Site Investigation, Concrete Mix Design, Dry Dock Excavation, Concrete Mixing-Plant Permissions, Bund Stability Assessment, Acoustic Studi, Geophysical Investigation of the Bund, among other technical services.
The Adriatic LNG Terminal (ALT) consists of a Gravity Base Structure (GBS) which will be installed on shallow water. The GBS comprises a rectangular concrete structure housing two large LNG tanks and supporting the equipment necessary to vaporize the liquid so that it can be piped to shore.