Projects / Bridges

UHPFRC/BSI for Ewijk Bridge

The Netherlands

UHPFRC/BSI for Ewijk Bridge
UHPFRC/BSI for Ewijk Bridge, photo 2
UHPFRC/BSI for Ewijk Bridge, photo 3
UHPFRC/BSI for Ewijk Bridge, photo 4
UHPFRC/BSI for Ewijk Bridge, photo 5
UHPFRC/BSI for Ewijk Bridge, photo 6
Client
Rijkswaterstaat, Dutch Ministry of Infrastructure and the Environment
Location
The Netherlands
Dates
2012 - 2013
Construction cost
Confidential
Key services
  • Bridge Technical Leader Bridge and Civil Structure Senior Engineer
Typology
  • Cable-Stayed Bridge (CSB)
  • Steel (orthotropic section) and Concrete deck
  • Span CSB: 105m + 270m

Technical suitability of the use of UHPFRC/BSI® Prefabricated Slab Panels for Ewijk Bridge (The Netherlands)

The objective of the present project was to perform the necessary desk study to justify the suitability of the Prefabricated UHPFRC/BSI® solution as a strengthening solution for steel deck fatigue problems typically encountered in The Netherlands. Fatigue pathologies, such as longitudinal through-deck plate cracks, and other critical preliminary failure mechanisn, were described in the developped report.

A comparison with the in-situ High Strength Concrete (HSC) alternative has also been performed. A fatigue assessment in four (4) pre-define locations (control points) of the steel deck structure has led to acceptable damage level for an extended life time of thirty (30) years.