Projects / Bridges
UHPFRC/BSI for Ewijk Bridge
The Netherlands






- Client
- Rijkswaterstaat, Dutch Ministry of Infrastructure and the Environment
- Location
- The Netherlands
- Dates
- 2012 - 2013
- Construction cost
- Confidential
- Key services
- Bridge Technical Leader Bridge and Civil Structure Senior Engineer
- Typology
- Cable-Stayed Bridge (CSB)
- Steel (orthotropic section) and Concrete deck
- Span CSB: 105m + 270m
Technical suitability of the use of UHPFRC/BSI® Prefabricated Slab Panels for Ewijk Bridge (The Netherlands)
The objective of the present project was to perform the necessary desk study to justify the suitability of the Prefabricated UHPFRC/BSI® solution as a strengthening solution for steel deck fatigue problems typically encountered in The Netherlands. Fatigue pathologies, such as longitudinal through-deck plate cracks, and other critical preliminary failure mechanisn, were described in the developped report.
A comparison with the in-situ High Strength Concrete (HSC) alternative has also been performed. A fatigue assessment in four (4) pre-define locations (control points) of the steel deck structure has led to acceptable damage level for an extended life time of thirty (30) years.