Projects / Infrastructures

Turcot Interchange

Montreal, Canada

Turcot Interchange
Turcot Interchange, photo 2
Turcot Interchange, photo 3
Turcot Interchange, photo 4
Turcot Interchange, photo 5
Turcot Interchange, photo 6
Client
Quebec Ministry of Transport (MTQ)
Location
Montreal, Canada
Dates
July 2015-2019
Construction cost
$1.54 billion
Key services
  • Independent Engineer
  • Lead Bridge and Civil Structure Senior Engineer (Design and Construction stages)
Typology
  • Cable-Stayed Bridge (CSB)
  • Multi-span continuous bridges (more than 15 Bridges)
  • Span CSB: 78m + 88m
  • Span Viaduct: from 25.5m to 66.5m

Lead Bridge and Civil Structure Senior Engineer for the Technical Review, and Design and Construction Independent Engineer services associated with the $1.54 billion Design-Build contract for the demolition and subsequent reconstruction of the elevated A20/A15 interchange in the heart of Montreal. More than 15 Bridges and 35 Retaining Walls have been reviewed over the different stages of the design development, including site supervision.

Also Lead Technical Reviewer for Existing Structure’s Modification (over ten (10) structures to be partially modified for temporary traffic management – structural modification / strengthening to existing structures works). Demolition strategy, sequence and equipment, including demolition experience. A technical review also took place for Bridge EF-0 (Cable Stayed Bridge) over the Lachine Canal built on an unconventional metohod.

PreviousRapid Impact and Needs AssessmentNextBicentennial Viaduct Due Diligence