Client
DBJV Dragages, Bouygues, Hong Kong
Location
Hong Kong
Dates
2014
Construction cost
Confidential
Key services
  • Resident Site Engineer, Bridge Senior Engineer
Typology
  • Tunnel Northern Launch Shaft
  • TBM Tunnel (Diameter 17m)
  • Length: 4500m

Resident Site Senior Engineer for the Launch Shaft Northern Landfall Structures (Base Slab, Cut and Cover and Approach Ramp Packages). TMCLK Tunnel consists of 4.5km sub-sea tunnel large 17m diameter twin tube TBM highway tunnel connecting Hong Kong Boundary Control facility near the airport to Tuen Mun town and the future Tuen Mun Western Bypass. Includes approximately connection cross passages as well as reclamation land, and approach roads and ramps